MAJOR ENGINEERING PROJECTS UNDERTAKEN BY BICO
Over the years, BICO has carried out a number of consultancy and services to various national institutions, industries, private and international organisations. A sample list of assignments accomplished by BICO consultants during the last five years (2020-2015) is presented below for project values greater than TZS 100 Million but less than TZS 3 Billion:
S/N. |
Project Name |
Client |
Year |
1. |
Consultancy services for preparation of an Integrated Water Resources Management and Development Plan for the Lake Victoria Basin |
Ministry of Water |
2019-2020 |
2. |
Feasibility Study & Detailed Engineering Design for Development of a Dry Port at Kwala Ruvu Coast Region Project. |
Tanzania Ports Authority |
2018-2020 |
3. |
Rehabilitation of the selected CoET buildings - Blocks A, B, B2, B3, C, D, H, F and L |
UDSM |
2019-2020 |
4. |
Geotechnical Investigation for Provision of Additional Berth at TPA Mtwara Port |
Tanzania Ports Authority |
2017-2018 |
5. |
Rehabilitation of Mabibo Hostels located in DSM |
UDSM |
2018 |
6. |
Rehabilitation of halls of residence No. 1 and 3 located at MJKN Mlimani campus DSM |
UDSM |
2019 |
7. |
Rehabilitation of Mazizini houses No. 1 and 2 at the institute of Marine Science-Zanzibar |
2019 |
|
8. |
Rehabilitation/maintenance of staff houses (Phase II - Kijitonyama houses) located in Sinza DSM |
UDSM |
2019 |
9. |
Provision of consultancy services for design and supervision of construction of a battoir at Tanga ward in Songes Municipal Council |
Songea Municipal Council |
2019-2020 |
10. |
Rehabilitation of hall of residence JPM Magufuli hostel at UDSM |
UDSM |
2019 |
11. |
Developing Guidelines & Procedures for Environmental Flow Assessment for Kihansi Catchment. |
NEMC |
2017-2019 |
12. |
Design & Supervision of Proposed Construction of New Facilities and Rehabilitation of Existing Facilities at Six Teachers Colleges |
Ministry of Education, Science and Technology (MoEST) |
2016-2019 |
13. |
Rehabilitation of Halls of Residence IV and VI located at MJKN Mlimani Campus, DSM |
UDSM |
2018 |
14. |
Consultancy service for supervision of Bus stand Songea Tanga ward |
Songea Municipal Council |
2018-2019 |
15. |
Roofing of Staff Houses (Phase I) Below, Located Within MJKN Mlimani Campus &Kunduchi, DSM |
UDSM |
2019 |
16. |
Rehabilitation of Hall One Hostel at MJKN Mlimani Campus, DSM |
UDSM |
2018 |
17. |
Rehabilitation of the Buildings: Nyerere I Theatre, Yombo Cafeteria and Yombo IV and V located at MJKN Mlimani Campus, DSM |
UDSM |
2018 |
18. |
Rehabilitation of Staff Houses Phase I located within MJKN Mlimani Campus, DSM |
UDSM |
2018 |
19. |
Manufacturing, Supplying & Fixing 58 Cabinets for Science Complex Building located at MJKN Mlimani Campus, DSM |
UDSM |
2018-2019 |
20. |
Design & Supervision of Proposed Construction of Colleges & a Model Sec. School to be Constructed at the UDOM. |
University of Dodoma (UDOM) |
2018 |
21. |
Design of Rehabilitation & Remodelling of Existing 6 Teachers Colleges |
MoEST |
2016 |
22. |
Provision of Consultancy Services for Detailed Designing and Construction, Supervision of Colleges |
Ardhi University |
2018-2019 |
23. |
Geotechnical investigation and studies for water storage structures at Luiche irrigation project (Ujiji District-Kigoma) in Tabora irrigation zone |
Tabora ST Development |
2017-2018 |
24. |
Provision of consultancy service for design and supervision of bus and truck terminal at Nyamuhongolo in Ilemela municipal council |
Ilemela municipal council |
2019-2020 |
25. |
Consultancy services for provision of network design services for the connection of Teachers training colleges and Technical and Vocational institutions into the National Information and Communication Technology 'ICT' broadband and backbone |
MoEST |
|
26. |
Construction of fence wall at MJKN Mlimani campus |
UDSM |
2019 |
27. |
Technical investigation and studies for water storage structures at Ibanda Dam (Geita Municipality in Mwanza Irrigation zone |
Mwanza ST Development |
2017 |
28. |
Proposed design and construction of private wards, VIP rooms and other hospital facilities at Muhimbili National hospital |
Muhimbili National Hospital (MNH) |
2017-2020 |
29. |
Project management and contract administration services for design and build of the CRDB Plc Head Quarters to be built on plot number 25 & 26 Ali Hassan Mwinyi Road and plot 21 Barack Obama in DSM |
National Housing Corporation (NHC) |
2017-2021 |
30. |
Supervision of construction and rehabilitation of Four Teachers Colleges (Kitangali, Ndala, Shinyanga and Mpuguso) |
MoEST |
2016-2019 |
31. |
Construction of Kabanga teachers college in Kasulu district |
MoEST |
2018-2019 |
32. |
Design and supervision of rehabilitation and remodelling of existing twenty (20) National Schools -Phase I |
MoEST |
2016-2017 |
33. |
Developing guidelines and Procedures for Environmental Flow Assessment (EFA) for Kihansi Catchment |
NEMC |
2017-2018 |
34. |
Design and supervision of construction of new facilities and rehabilitation of existing facilities at Six Teachers Colleges |
MoEST |
2016-2017 |
35. |
Consultancy Services for Procurement Review, Capacity Building and Preparation of Projects Quality Management System for MoEST |
2019-2020 |
|
36. |
Provision of consultancy services for feasibility study, detailed design and preparation of tender documents of Matwiga dam water supply scheme at Chunya district council in Mbeya region |
Chunya District Council |
2019 |
37. |
Consultancy Services for Study on Improvement of Bandari College (Master Plan) |
TPA |
2019 |
38. |
Technical investigation and studies for water storage structures at Gidahababieg dam (Hanang District) in Dodoma Irrigation zone |
Dodoma ST Development |
2017 |
39. |
Geotechnical investigation for the proposed Nyamisati Jetty at Rufiji |
TPA |
2017 |
40. |
Consultancy Services for the Design and Supervision of Completion of TIRDO Admin. Building's Construction |
TIRDO |
2018 |
41. |
Technical investigation and studies for water storage structures at Lwanyo Dam (Mbalali District) in Mbeya Irrigation zone |
Mbeya ST Development |
2017-2018 |
42. |
Consultancy Services for Affordability study on the EWURA's regulated services |
EWURA |
2018-2019 |
43. |
Geotechnical survey and impact assessment -EIA and seismological study for construction of SUMATRA house in Dodoma and Mbeya |
SUMATRA |
2017 |
44. |
Detailed Feasibility study of the Government press and preparation of a business plan to transform the Government press |
Prime Minister's Office (PMO) |
2016 |
45. |
Preparation of fisheries master plan to implement the fisheries policy, Zanzibar |
Ministry of Agriculture Natural Resources Livestock and Fisheries-Zanzibar |
2017 |
46. |
Inspection services to evaluate the design specification of the LPG handling facilities and appropriate ration of propane and butane in the LPG mixture for Tanzania Mainland |
EWURA |
2017 |
47. |
Supervision services to the proposed construction works of Makambako Town Council Head Office Building at Makambako Town |
Makambako Town Council |
2017-2018 |
48. |
Feasibility study for septic tank sewarage treatment facilities in area with no sewers and with poor sanitation in Dar es salaam |
DAWASA |
2017 |