MAJOR ENGINEERING PROJECTS UNDERTAKEN BY BICO

Over the years, BICO has carried out a number of consultancy and services to various national institutions, industries, private and international organisations. A sample list of assignments accomplished by BICO consultants during the last five years (2020-2015) is presented below for project values greater than TZS 100 Million but less than TZS 3 Billion:

S/N.

Project Name

Client

Year

1.

Consultancy services for preparation of an Integrated Water Resources Management and Development Plan for the Lake Victoria Basin

Ministry of Water

2019-2020

2.

Feasibility Study & Detailed Engineering Design for Development of a Dry Port at Kwala Ruvu Coast Region Project.

Tanzania Ports Authority

2018-2020

3.

Rehabilitation of the selected CoET buildings - Blocks A, B, B2, B3, C, D, H, F and L

UDSM

2019-2020

4.

Geotechnical Investigation for Provision of Additional Berth at TPA Mtwara Port

Tanzania Ports Authority

2017-2018

5.

Rehabilitation of Mabibo Hostels located in DSM

UDSM

2018

6.

Rehabilitation of halls of residence No. 1 and 3 located at MJKN Mlimani campus DSM

UDSM

2019

7.

Rehabilitation of Mazizini houses No. 1 and 2 at the institute of Marine Science-Zanzibar

 

2019

8.

Rehabilitation/maintenance of staff houses (Phase II - Kijitonyama houses) located in Sinza DSM

UDSM

2019

9.

Provision of consultancy services for design and supervision of construction of a battoir at Tanga ward in Songes Municipal Council

Songea Municipal Council

2019-2020

10.

Rehabilitation of hall of residence JPM Magufuli hostel at UDSM

UDSM

2019

11.

Developing Guidelines & Procedures for Environmental Flow Assessment for Kihansi Catchment.

NEMC

2017-2019

12.

Design & Supervision of Proposed Construction of New Facilities and Rehabilitation of Existing Facilities at Six Teachers Colleges

Ministry of Education, Science and Technology (MoEST)

2016-2019

13.

Rehabilitation of Halls of Residence IV and VI located at MJKN Mlimani Campus, DSM

UDSM

2018

14.

Consultancy service for supervision of Bus stand Songea Tanga ward

Songea Municipal Council

2018-2019

15.

Roofing of Staff Houses (Phase I) Below, Located Within MJKN Mlimani Campus &Kunduchi, DSM

UDSM

2019

16.

Rehabilitation of Hall One Hostel at MJKN Mlimani Campus,   DSM

UDSM

2018

17.

Rehabilitation of the Buildings: Nyerere I Theatre, Yombo Cafeteria and Yombo IV and V located at MJKN Mlimani Campus, DSM

UDSM

2018

18.

Rehabilitation of Staff Houses Phase I located within MJKN Mlimani Campus, DSM

UDSM

2018

19.

Manufacturing, Supplying & Fixing 58 Cabinets for Science Complex Building   located at MJKN Mlimani Campus, DSM

UDSM

2018-2019

20.

Design & Supervision of Proposed Construction of Colleges & a Model Sec. School to be Constructed at the UDOM.

University of Dodoma (UDOM)

2018

21.

Design of Rehabilitation & Remodelling of Existing 6 Teachers Colleges

MoEST

2016

22.

Provision of Consultancy Services for Detailed Designing and Construction, Supervision of Colleges

Ardhi University

2018-2019

23.

Geotechnical investigation and studies for water storage structures at Luiche irrigation project (Ujiji District-Kigoma) in Tabora irrigation zone

Tabora ST Development

2017-2018

24.

Provision of consultancy service for design and supervision of bus and truck terminal at Nyamuhongolo in Ilemela municipal council

Ilemela municipal council

2019-2020

25.

Consultancy services for provision of network design services for the connection of Teachers training colleges and Technical and Vocational institutions into the National Information and Communication Technology 'ICT' broadband and backbone

MoEST

 

26.

Construction of fence wall at MJKN Mlimani campus

UDSM

2019

27.

Technical investigation and studies for water storage structures at Ibanda Dam (Geita Municipality in Mwanza Irrigation zone

Mwanza ST Development

2017

28.

Proposed design and construction of private wards, VIP rooms and other hospital facilities at Muhimbili National hospital

Muhimbili National Hospital (MNH)

2017-2020

29.

Project management and contract administration services for design and build of the CRDB Plc Head Quarters to be built on plot number 25 & 26 Ali Hassan Mwinyi Road and plot 21 Barack Obama in DSM

National Housing Corporation (NHC)

2017-2021

30.

Supervision of construction and rehabilitation of Four Teachers Colleges (Kitangali, Ndala, Shinyanga and Mpuguso)

MoEST

2016-2019

31.

Construction of Kabanga teachers college in Kasulu district

MoEST

2018-2019

32.

Design and supervision of rehabilitation and remodelling of existing twenty (20) National Schools -Phase I

MoEST

2016-2017

33.

Developing guidelines and Procedures for Environmental Flow Assessment (EFA) for Kihansi Catchment

NEMC

2017-2018

34.

Design and supervision of construction of new facilities and rehabilitation of existing facilities at Six Teachers Colleges

MoEST

2016-2017

35.

Consultancy Services for Procurement Review, Capacity Building and Preparation of Projects Quality Management System for MoEST

 

2019-2020

36.

Provision of consultancy services for feasibility study, detailed design and preparation of tender documents of Matwiga dam water supply scheme at Chunya district council in Mbeya region

Chunya District Council

2019

37.

Consultancy Services for Study on Improvement of Bandari College (Master Plan)

TPA

2019

38.

Technical investigation and studies for water storage structures at Gidahababieg dam (Hanang District) in Dodoma Irrigation zone

Dodoma ST Development

2017

39.

Geotechnical investigation for the proposed Nyamisati Jetty at Rufiji

TPA

2017

40.

Consultancy Services for the Design and Supervision of Completion of TIRDO Admin. Building's Construction

TIRDO

2018

41.

Technical investigation and studies for water storage structures at Lwanyo Dam (Mbalali District) in Mbeya Irrigation zone

Mbeya ST Development

2017-2018

42.

Consultancy Services for Affordability study on the EWURA's regulated services

EWURA

2018-2019

43.

Geotechnical survey and impact assessment -EIA and seismological study for construction of SUMATRA house in Dodoma and Mbeya

SUMATRA

2017

44.

Detailed Feasibility study of the Government press and preparation of a business plan to transform the Government press

Prime Minister's Office (PMO)

2016

45.

Preparation of fisheries master plan to implement the fisheries policy, Zanzibar

Ministry of Agriculture Natural Resources Livestock and Fisheries-Zanzibar

2017

46.

Inspection services to evaluate the design specification of the LPG handling facilities and appropriate ration of propane and butane in the LPG mixture for Tanzania Mainland

EWURA

2017

47.

Supervision services to the proposed construction works of Makambako Town Council Head Office Building at Makambako Town

Makambako Town Council

2017-2018

48.

Feasibility study for septic tank sewarage treatment facilities in area with no sewers and with poor sanitation in Dar es salaam

DAWASA

2017


ALMANAC

Login